Can You Move the Kitchen or Bathroom in an Apartment
Whether you can relocate kitchen or bathroom in a Moscow apartment: wet-area rules, risers, sewer slopes, approval, neighbor risk, and common mistakes.
Profmaster Editorial
Apartment Renovation Experts
TL;DR
TL;DR
Kitchen or bathroom relocation is possible only if the new wet area does not end up above neighbors' dry living rooms and risers, slopes, and ventilation allow safe use. Any move requires approval before work. Feasibility is defined by the floor plan and project.
You can relocate kitchen or bathroom in a Moscow apartment only where the floor plan allows: the new wet area must not sit above neighbors' dry living rooms below, and sewer, risers, slopes, and ventilation must support safe operation. Any relocation requires approval before chasing walls — otherwise you risk fines, orders to restore layout, and flooding neighbors.
Profmaster has delivered turnkey apartment renovation in Moscow and the region since 2006. Below is how to check feasibility, what goes into the project, and how not to confuse a convenient idea with engineering reality. This article is informational and not legal advice.
Official materials: layout changes on mos.ru, MGI key information.
What counts as a wet area
In short: wet areas are rooms and zones with regular water supply and drainage.
| Zone | Typical equipment | Engineering load |
|---|---|---|
| Bathroom | Toilet, basin, shower/bath | Sewer, hot/cold water, ventilation |
| Kitchen | Sink, dishwasher, sometimes washer | Water, sewer, electrical, gas/extract |
| Laundry nook | Washer, dryer | Water, sewer, electrical |
| Shower room | Tray, hydro equipment | Waterproofing, slopes, ventilation |
If you simplify: if water drains there regularly, it is not a “normal room” — it is an engineering node with higher waterproofing and neighbor risk.
The main rule: what is below you and below neighbors
In short: do not place wet areas above neighbors' dry living rooms unless the building project allows it.
| New wet-area location | Typical assessment |
|---|---|
| Above neighbor's bathroom/kitchen below | More often allowed with correct engineering |
| Above neighbor's hall/storage | Depends on building project |
| Above neighbor's bedroom/living room | Usually not allowed |
| Above your own bedroom/living room | Often not allowed or needs special solution |
| In technical corridor/shaft zone | Check on floor plan |
The floor plan is the first document a designer requests. Without it, discussing relocation is pointless: a designer can draw a shower in a bedroom, but MGI may not approve it.
Main risk: copying a magazine layout without checking building structure.
Bathroom relocation: engineering limits
In short: toilet and shower move only as far as sewer slope and floor height allow.
What affects allowable pipe routing:
- distance to sewer riser;
- pipe diameter and number of bends;
- need for platform or raised floor for slope;
- depth of chases in slab — often limited;
- access hatches and revisions;
- ventilation shaft — cannot be taken for furniture.
| Task | Typical engineering solution |
|---|---|
| Moving toilet 1–2 m | New routing with slope within platform |
| Moving far from riser | Platform, sometimes pump scheme — per project |
| Combining bath and toilet | Sewer reroute, new slopes |
| Second bathroom | Riser connection, ventilation, waterproofing |
Practical bathroom checklist: combined bathroom checklist. Bathroom budget guide: bathroom renovation cost — after site visit.
Kitchen relocation: water, gas, ventilation
In short: kitchen is wet area plus high electrical and sometimes gas load.
When moving kitchen, check:
- sewer slope for sink;
- water pressure and pipe diameter;
- whether location is allowed above rooms below;
- gas behavior if present;
- kitchen extract route;
- electrical capacity for hob and oven.
| Scenario | What is usually approved |
|---|---|
| Moving sink along kitchen wall | Reconfiguration |
| Kitchen in former bedroom | Layout + reconfiguration |
| Merging kitchen and living room | See merging rules |
| Moving gas hob | Separate gas approval |
What needs approval and what does not
| Action | Approval | Comment |
|---|---|---|
| Moving toilet/shower within bathroom | Yes | Reconfiguration changes |
| Expanding bathroom into hall | Yes | Plan changes |
| Moving kitchen sink | Yes | Water and sewer |
| Bath to shower without moving drain | Often yes | Waterproofing and junctions |
| Tile refresh without moving points | Usually no | If plan and pipes unchanged |
| Moving washer to hall | Depends on project | New wet point |
Waterproofing and neighbor liability
In short: wet-zone relocation always raises leak risk; saving on waterproofing leads to opening finished work at your home and neighbors'.
Minimum project and site package:
- two-layer floor and wall waterproofing in wet zone;
- correct junctions at trays, toilet, shower base;
- height reserve for sewer slope;
- proper slab penetrations;
- system test before tiling.
Main risk: a “thin” floor without platform where slope cannot be met — clogs and overflows appear after handover.
Checklist before moving a wet zone
- Building floor plan obtained.
- What is below new zone on lower floor checked.
- Distance to sewer and water risers defined.
- Slope feasibility without damaging slab structure assessed.
- Ventilation shafts checked — not previously sealed.
- Gas presence and kitchen impact confirmed.
- Layout/reconfiguration project ordered.
- Permit obtained before chases and demolition.
- Estimate lists waterproofing, platform, MEP, approval separately.
- Wet-zone electrical agreed — electrical plan.
- Access hatches and revisions planned after finish.
- Testing sequence before closing tile understood.
Risks, consequences, and prevention
| Risk | Consequence | Prevention |
|---|---|---|
| Wet zone above neighbor's bedroom | MGI rejection, leaks, disputes | Floor plan check before design |
| Insufficient sewer slope | Clogs, odor, floor rework | Calculation in project, platform |
| Chasing slab without project | Slab damage, rejection | Technical solution and permit |
| Weak waterproofing | Neighbor flooding, repair at your cost | Two-layer waterproofing and test |
| Sealed ventilation | Mold, condensation | Keep/relocate duct per project |
| Work without approval | Fine, restoration | Project before start |
| No access hatches | Unserviceable hidden nodes | Hatches in estimate |
Link to full renovation and budget
Wet-zone relocation usually increases:
- demolition and rough work;
- plumbing and waterproofing cost;
- approval timeline;
- electrical and ventilation requirements;
- hidden defect risk in resale stock.
In resale apartments, audit actual pipes before design — resale checklist. Broader approval context: layout approval 2026.
Preliminary capital renovation guide: calculator; exact total with kitchen or bathroom move is fixed after site visit.
When to contact Profmaster
Contact Profmaster if you plan kitchen or bathroom relocation within capital renovation and want engineering and finishing calculated upfront, not “as we go.”
We are a fit when:
- turnkey renovation with plumbing, waterproofing, and tile is needed;
- routes must be agreed before floors and walls close;
- multiple wet zones or non-standard layout is planned;
- full MEP is needed with electrical planning;
- you want one team for the full cycle.
The company has worked since 2006. Approval design is done by a licensed organization; we build renovation to the approved scheme.
Request via services or contacts.
Summary
Kitchen or bathroom relocation works only where floor plan and project confirm it: allowable position over neighbors, working slopes, ventilation, and waterproofing. Without approval, such work is a direct path to leaks, fines, and paying for renovation twice.
In short: floor plan and project first, then chases. A wet zone is responsibility to MGI and to neighbors below.
Disclaimer: for information only, not legal advice. Feasibility depends on building type, floor plan, and approving authorities. Current process on mos.ru.
Frequently Asked Questions
Can you move the bathroom to another part of the apartment?
Sometimes yes, if the new zone sits above neighbors' wet areas or allowed technical zones per the building plan, sewer slope works, and ventilation exists. Above a neighbor's bedroom or living room — usually no. Project and approval are required.
Can you move the kitchen into a hall or bedroom?
Depends on riser position, gas, ventilation, and what is below on the floor underneath. Kitchen relocation almost always requires layout and reconfiguration approval.
How far can a toilet move from the riser?
Limited by sewer slope and floor build-up height. Distance is calculated in the project — there is no universal meter limit for all apartments.
Do you need approval only to move the sink?
If water and sewer points change with layout, yes. Even a 'small' move can be reconfiguration.
What if a bathroom is built above a neighbor's bedroom?
High risk of rejection, leak claims, and orders to restore layout. Such solutions are usually not allowed.
Can you expand the bathroom into the hall?
Often yes, if wet-area, ventilation, and load-bearing rules are respected. Project and approval required.
Does wet-zone relocation affect renovation cost?
Yes, noticeably: platforms, slopes, waterproofing, new riser work, ventilation, project, and approval. Guides come after site visit, not generic price per square meter.
Key Topics
Renovation Questions?
Submit a request to discuss your task and understand the next project step.
Get a consultationOther Blog Articles
Apartment Design Project Cost: Price and Scope of Work
Apartment design project cost: packages, stages, supervision, area benchmarks, and how to link the project to a renovation estimate.
Read →Apartment Electrical Plan Before Renovation
How to plan apartment electrical work before renovation: outlets by zone, circuits, panel, RCDs, estimate items, and photos before walls close.
Read →Apartment Layout Changes in Moscow in 2026: What Needs Approval
What to approve before changing your apartment layout in Moscow in 2026: partitions, openings, wet areas, documents, risks, and the right order of work before renovation starts.
Read →